KÖSTER FLOOR EP INDUSTRY FLEX LITE

1 mm, rolled applied, low-emission, crack-bridging, easy to apply, epoxy flooring system with smooth surface and single-color gloss finish

Fields of application

Industrial flooring system for indoor and outdoor applications and horizontal surfaces, suitable for light to medium-duty in low to moderate traffic areas, with very high chemical resistance, moderate crack-bridging properties and functional aesthetics

Sectors

General industry, chemical industry, agricultural facilities, wastewater treatment, biogas plants, and secondary containments

System Build-Up

Layer Description Material Consumption
SubstrateConcrete / cementitious screed
1PrimerKÖSTER CT 121 filled at a ratio 1 : 0.2 by weight with Quartz Sand 0.06–0.36 mm (CT 483) or similar.0.40 kg/m² (0.32 resin + 0.08 filler)
2Thincoat KÖSTER CT 228 Flex1.00 kg/m² in two layers


Comments



Application parameters

Material Substrate conditions Application conditions Mixing regime Application tools Pot life / Recoating interval / Ready for traffic
Concrete / cementitious screed
1KÖSTER CT 121 filled at a ratio 1 : 0.2 by weight with Quartz Sand 0.06–0.36 mm (CT 483) or similar.ICRI CSP 3–5 (depending on the expected traffic) by shot blasting or previously primed, scratchcoated, sandbroadcasted or coated surface. Clean, sound and visible dry Tensile strength > 1.5 N/mm² Substrate relative humidity: < 4 % CM DeviceMaterial temperature 15–25 °C Substrate and ambient temperature 8–30 °C Substrate and material temperatures must be ≥ 3 °C above dew point during application and for 12 h.Electric single or double paddle mixer (300–400 rpm) Mix for 2 min Transfer to a clean container Add filler Mix for an additional 1 min and scrape the sidesRubber Squeegee 40 cm (CT 922 002) Resin Roller 25 cm (CT 961 002) Resin Roller 10 cm (CT 913 001)Pot life: 60 min. Recoating interval: 10 °C: 24 - 72 h 20 °C: 18 - 48 h 30 °C: 12 - 48 h
2KÖSTER CT 228 FlexPreviously primed, scratchcoated, sandbroadcast or coated surface. Clean, sound and visible dry Tensile strength > 1.5 N/mm² Substrate relative humidity: < 4 % CM Device Material temperature 15–25 °C Substrate and ambient temperature 10–30 °C Substrate and material temperatures must be ≥ 3 °C above dew point during application and for 12 h. Electric single paddle mixer (300–400 rpm) Mix for 2 min Transfer to a clean container Mix for an additional 1 min and scrape the sides Rubber Squeegee 40 cm (CT 922 002) Resin Roller 25 cm (CT 961 002) Resin Roller 10 cm (CT 913 001) Pot life: 40 min. Recoating interval: 10 °C: 24 - 36 h 20 °C: 18 - 24 h 30 °C: 12 - 24 h Ready for light traffic (hours) / fully cured (days): 10 °C: 72 h / 7 d 20 °C: 48 h / 5 d 30 °C: 24 h - 3 d

 

Back

Top
Albania Bosnia and Herzegovina Brasil Bulgaria China Colombia Croatia Czech Republic Denmark Finland Germany Greece Iraq Italy Japan Kazakhstan Kuwait Latvia Lebanon Macedonia Mexico Netherlands New Zealand Panama Poland Portugal Romania Serbia Slovakia Slovenia South Africa Spain Turkey Ukraine United Kingdom United States of America